Six stages, one team
Select a stage to see what it delivers.
Concept development
We study alternative solutions and compare function, installation and fabrication before investing in detailed design.
- Comparative study of the alternatives, with their advantages and limitations
- Analytical preliminary sizing of the recommended option
Subsea equipment and tools
We develop the complete piece of equipment, with installation and operating interfaces defined from the outset.
- 3D model of the equipment or tool1
- Documented design requirements and interfaces
1 The supply of 3D models and the file formats are defined by contract.
Detailed design
We take every component to fabrication level: geometry, seals and fasteners.
- Components and assemblies detailed in the 3D model1
- Specification of materials, seals and fasteners
1 The supply of 3D models and the file formats are defined by contract.
Fabrication drawings
We turn the detailed model into drawings that guide fabrication, to the documentation standard agreed with the client.
- General arrangement and assembly drawings
- Part drawings with tolerances and surface finishes
- Revision history
Numerical and analytical calculations
We verify the design using finite element analysis (FEA), computational fluid dynamics (CFD) and analytical calculations, to the applicable standard.
- Analysis reports
- Calculation report
Simulation to support every decision
Examples from our team’s experience. Click an image to enlarge it.
Structures
Lifting, transport and in-service conditions of subsea and offshore structures.
- Linear and non-linear static analysis
- Contact and plasticity
- Shell models with refined mesh at the joints
Pressure and impact
Components under combined loads and impact events during installation.
- Combined pressure, tension and bending
- Temperature effects
- Explicit dynamics
Mechanisms
Tools with moving parts, simulated throughout the actuation stroke.
- Contact between components
- Bolt preload
- Springs and locking mechanisms
Fluid dynamics
Internal and external flows to predict erosion, loads and design coefficients.
- Particle (sand) erosion
- Transient multiphase flow
- Hydrodynamic coefficients
Vibration and fatigue
Flow-induced vibration (FIV) in subsea Christmas trees, chemical injection lines and jumpers, from the flow field to fatigue life.
- Transient multiphase CFD
- Random vibration structural response
- Stress PSD and cumulative fatigue damage
Key standards for subsea equipment
The ones we use most often, though not the only ones. Filter by issuing body.
- Project requirements checked against the standard before analysis
- Cross-checking between analytical and numerical results
- Acceptance criteria from the applicable standard
Standards are cited as technical references only and do not imply certification, licensing or affiliation with the bodies that publish them.
From 3D model to fabrication drawing
The same workflow applies to any component.
The example is an API 17D type SV flange.
3D model
We model the assembled component, including the seal ring and contact surfaces.
- Component and assembly geometry1
1 The supply of 3D models and the file formats are defined by contract.
Numerical analysis
We subject the model to the design conditions, with elastic-plastic material behaviour and contact between parts.
- Stresses and strains compared with the acceptance criteria
- Recommended geometry changes, where needed
Fabrication drawing
The drawing is only issued after verification: dimensions, sealing and test points match the geometry approved in the analysis.
- Dimensioned drawing of the verified component
- Traceability between drawing, model and analysis report
Quality management and technical documentation
Quality is built in from the very first concept and recorded in every document we issue.
- Organised, verified and traceable documentation
- A record of the critical review of client references against the applicable standards
Results
Critical document review
Before we design, we check the project documents against the applicable standards and record any discrepancies.
Technical documentation
Reports, calculation reports, specifications and drawings written to be audited: assumptions, input data, criteria and results in one place.
Revision control
Controlled document numbering and revisions at every issue, in the Oracus format or the client’s template.
Quality management
Processes aligned with ISO 90012, with verification before every issue.
2 Guidance for our internal processes; this does not represent certification.